Malta has 115 days. By 1 December 2026, it must tell UNESCO what it has done to protect Valletta. Not what it intends to do. Not how many meetings it held. What changed, what was adopted, and what can be verified.

The World Heritage Committee’s decision is unusually specific. It names planning policies, the buffer zone, residents’ living conditions, tourism management, Heritage Impact Assessments and individual projects. Evans Building is one of them.

This page tracks the public evidence. The standard is simple: if a measure is complete, publish the document, the date it was adopted, the date it was sent to UNESCO and any review by ICOMOS or the World Heritage Centre.

Where that evidence is not public, we say not publicly demonstrated. That does not prove no work exists behind closed doors. It proves the public cannot verify it.

What UNESCO actually decided

In July 2025, the Committee adopted Decision 47 COM 7B.114 on the City of Valletta.

It welcomed Malta’s submission of a draft Management Plan, a Views and Vistas Analysis, a proposed buffer zone and some impact assessments. Then it made clear that this was not enough.

Planning rules: UNESCO said current planning policies and regulations do not sufficiently safeguard Valletta’s setting.Height controls: Malta was asked to revise the Views and Vistas Analysis, the 2006 North Harbour Local Plan, the 2014 Floor Area Ratio policy guide and the 2022 Grand Harbour Local Plan.Buffer zone: The proposed zone needs further work, especially along its northern boundary across Marsamxett Harbour, an area UNESCO identified as having high development potential.Residents and tourism: The updated Management Plan needs a detailed Action Plan with short-, medium- and long-term measures. Essential services, residents’ living conditions and tourism management are named priorities.Impact assessment: Malta is expected to assess indirect and cumulative effects, not only the footprint of one project at a time, and to send relevant project details and HIAs for international review before planning approval.

The deadline for Malta’s updated State of Conservation report is 1 December 2026. The Committee is due to examine it at its 49th session.

The public scoreboard

As of 8 August 2026, this is what the official public record demonstrates.

Partly completed

Not publicly demonstrated

This is a transparency finding. Any authority can correct it by publishing the evidence.

Why Evans Building is the test

Evans Building appears in two consecutive World Heritage Committee decisions.

In Decision 45 COM 7B.190 of 2023, the Committee encouraged Malta to improve its HIA process, consider indirect and cumulative impacts, and submit project details and assessments for Evans and Manoel Island before difficult-to-reverse decisions.

The 2025 decision goes further. It expressly names the proposed repurposing of Evans Building when encouraging Malta to submit detailed project information and the respective HIA before planning approval. It also calls for the Evans Conservation Management Plan to be supplemented.

That creates six questions the government can answer now:

  1. What version of the proposed hotel project has been sent to the World Heritage Centre?
  2. Has a project-specific HIA been completed?
  3. Does it assess cumulative hotel and tourism pressure, not only physical changes to the building?
  4. Has the Conservation Management Plan been supplemented?
  5. What did ICOMOS or another Advisory Body advise?
  6. Will the complete record be published before planning approval or irreversible work?

The procurement judgment of 25 June 2026 restored the concession award. It did not grant planning permission, complete an HIA, approve work to cultural property or settle the treatment of archaeology. Those processes remain separate.

Winning a concession is not the same thing as proving that a project protects Valletta’s World Heritage value.

What a Heritage Impact Assessment must do

An HIA is not a paragraph saying a project will use sympathetic stone and retain a façade. The UNESCO and Advisory Bodies toolkit requires the effect on Outstanding Universal Value to be considered before decisions become difficult to reverse.

For Evans, that means looking beyond the shell of the building. The assessment must consider the site’s archaeology, its relationship with Fort St Elmo and Valletta’s urban fabric, added visitor and service pressure, cumulative hotel development, and alternatives that may cause less harm.

It must also be independent enough to test the proposal. An assessment written to justify a settled commercial decision is paperwork, not protection.

What the deadline does not mean

The 1 December date is Malta’s reporting deadline. It is not a deadline for completing an Evans HIA, deciding a planning application or sending this campaign letter.

It is also wrong to claim that Valletta automatically goes onto the List of World Heritage in Danger if the report is weak. Decision 47 COM 7B.114 does not say that. The Committee will examine Malta’s report and decide what follows through the World Heritage process.

That distinction does not weaken the campaign. It makes it harder to dismiss. Malta has been given a formal deadline to account for specific gaps. The public has every right to demand the evidence before the report is written behind closed doors.

What a credible report must contain

A serious State of Conservation report should include:

Without annexes and dates, a report can list activity while concealing whether anything changed.